Engineers new to fire detection and alarm work usually learn to terminate FP200 early on. In UK fire alarm installations it is probably the most common fire-resisting cable. A neat termination shows you know what you’re doing, and a poor one can cause faults that are hard to trace later. This guide covers how to prepare and gland the cable, why each step matters, and the related points that come up in installation exams.
What FP200 Actually Is
Start with the name, because it’s a common exam trap. FP stands for Fire Performance, not Fire Protection. The name describes how the cable behaves in a fire: it keeps the circuit working long enough for the system to do its job.
FP200 is one cable in a wider range of fire-resisting cables, and there are other variants for different uses. It is usually supplied in red, which many specifications ask for so that fire alarm wiring is easy to tell apart from other services. White, black and other colours are also available where looks matter.
A typical FP200 cable has:
- an outer polymer sheath, which gives mechanical protection and the colour
- an aluminium screen under the sheath, which is mainly what gives the cable its fire performance and screening
- insulated cores (commonly two) and a bare circuit protective conductor (CPC)
The bare CPC is a detail people forget. It always needs green-and-yellow sleeving before you terminate it.
Why FP200 Over Mineral Insulated Cable?
Mineral insulated copper cable (MICC) has a very good fire performance record. However, it is slow to terminate. You have to strip the copper sheath, fit a seal, fill it with compound and crimp it, and every termination is a chance for moisture to get in.
FP200 gives most of the fire resistance that a typical fire alarm installation needs, and it takes far less time to terminate. On a site with hundreds of devices, that saved time is real money, which is why FP200 and similar “soft-skin” cables are now so common in the industry.
That doesn’t mean FP200 is right for every job. The cable must suit the fire resistance the design calls for (more on this below).
Step-by-Step: Terminating FP200
1. Decide on your tail length
Work out how much cable you need inside the enclosure, whether that’s a detector base, sounder back box, call point or panel. Around 50 mm of free conductor is a sensible starting point. It gives you room to dress the cores neatly without leaving loose loops in the box.
2. Score the sheath, don’t cut through it
Some engineers use a junior hacksaw. Many prefer a sharp knife. Either way, the method is the same:
- Hold the cable steady on a firm surface.
- Run the blade around the cable to score the outer sheath and the aluminium screen beneath it.
- Use light pressure. The cores sit very close under the screen, and you only want to weaken the sheath, not cut through it.
3. Bend and snap the sheath off
Hold the cable just below the score line with pliers and bend it at the line. Because you scored it, the sheath and screen should break cleanly and slide off in one piece, leaving a tidy shoulder.
Check the cores straight away. Any nick in the insulation can cause an earth fault or low insulation resistance reading when the system is commissioned. If in doubt, cut it back and start again.
4. Fit the gland
You don’t need to take the gland apart. Slide it onto the cable as it is. At this stage it will move freely along the sheath.
Inside the gland is a rubber seal. When you tighten the gland nut onto the body, the seal is squeezed inwards and grips the outer sheath of the cable. That grip holds the cable in place.
Leave a small amount of sheath, roughly 10–20 mm, sticking out past the gland into the enclosure. This exposed sheath protects the cores where they pass through the entry and stops sharp edges rubbing on the insulation.
5. Tighten carefully
Tighten the gland by hand, then give it a gentle nip with a tool if needed.
FP200 glands usually have plastic threads. Over-tightening strips them easily, and a stripped gland can’t hold the cable properly. Tighten until the gland can’t slide along the cable, then stop.
6. Fix the gland to the enclosure
Fit the gland through the knockout or entry and secure it with its locking ring. Again, tighten by hand first and then nip it up gently with a tool. It’s good practice to match the gland colour to the cable, for example red glands on red cable.
7. Sleeve and terminate the CPC
Sleeve the bare CPC in green-and-yellow before you connect it. Then terminate all the conductors at the right terminals, following the device manufacturer’s instructions.
The Bigger Picture: Where BS 5839-1 Comes In
Terminating a cable neatly is only part of the job. BS 5839-1 sets out how fire alarm cables should be chosen, installed and supported, and installation exams test these points. Topics to revise include:
- Fire resistance: the standard separates cables of standard fire resistance from cables of enhanced fire resistance. Which one you need depends on the building, the evacuation strategy and the system design. Make sure the cable you’re installing matches what the designer specified.
- Support and fixings: cables should be fixed so they won’t collapse early in a fire. In practice that means fire-resisting (usually metal) fixings and supports, not plastic clips or cable ties alone.
- Segregation: fire alarm cables should be kept apart from other services, or suitably separated from them, to reduce the risk of damage and interference.
- Mechanical protection: consider where the cable runs. Exposed areas may need extra protection.
- Colour: red is the preferred colour for fire alarm cables so they can be identified easily.
For more on how installation and commissioning fit together on a real job, see our real project walkthrough. If you want a refresher on how the standard is structured, read What Is BS 5839-1?.
Exam tip: questions often test whether you know that the fixings matter as much as the cable. A fire-resisting cable held up by plastic clips can still fall early in a fire and break the circuit.
Testing After Termination
Poor termination usually shows up at testing. Before the system is commissioned, carry out insulation resistance and continuity tests, following the manufacturer’s guidance on disconnecting sensitive equipment first. Nicked cores, swarf in the enclosure or a CPC touching a live terminal will all appear here. It’s far better to find them before the panel is powered than to chase intermittent earth faults afterwards. Our guide to commissioning an addressable fire alarm control panel explains what the commissioning engineer will check.
Practical Caveats
- Always follow the manufacturer’s data for minimum bend radius, compatible glands, support spacing and termination methods. These can differ between cable brands and between products in the same range.
- Check the project specification. Some specifications require a particular cable grade, colour or manufacturer.
- Check the current published standard. BS 5839-1 has been revised several times, and clause numbers and wording change between editions. Make sure you know which edition your exam is based on.
How Fire Regs Pro Fits Into This
Knowing how to terminate FP200 is a practical skill. To pass an exam, you also need to know the rules behind it: cable selection, fire resistance, support, segregation and testing. Fire Regs Pro is designed to help you revise those rules, with 1462 questions across 71 topics and 7 exam paths covering design, installation, commissioning and maintenance.
You can test yourself with the free practice quiz and compare routes on the exam paths page. You can also use the nine quick-reference areas to check BS 5839 requirements quickly, and the six calculators for jobs such as battery sizing. For day-to-day work, the field records feature keeps your certificates, service log and CPD in one place, so your paperwork stays as tidy as your terminations.
Frequently asked questions
What does the FP in FP200 stand for?
FP stands for Fire Performance, not Fire Protection as many people assume. The name refers to how well the cable keeps a circuit working when it is exposed to fire.
Why is FP200 often chosen over mineral insulated cable for fire alarm work?
FP200 is much quicker and easier to terminate than mineral insulated cable. It needs no seals or potting compound and no specialist crimping tools. On a large installation that saved labour adds up, and it still gives the fire resistance most fire alarm circuits need.
Does the bare earth conductor in FP200 need sleeving?
Yes. The circuit protective conductor is supplied bare, so you must sleeve it with green-and-yellow sleeving before you terminate it at the device, back box or panel.
How tight should an FP200 gland be?
Tighten it by hand, then give it a gentle nip with a tool if needed. FP200 glands usually have plastic threads that strip easily, so do not over-tighten them. The gland only needs to grip the outer sheath firmly enough that it cannot move.